Before a new mold enters production, trial runs help catch tooling problems, part defects, and unstable processing conditions. But a few good-looking samples don’t necessarily mean the mold is ready.
At HingTung, mold trials connect tooling development with production. This injection mold trial checklist explains what happens during T0, T1, and T2, what to inspect, and when a mold is ready for production approval.
What Do T0, T1, and T2 Mean in Injection Molding?
T0, T1, and T2 are common stages in injection mold testing and validation. Each stage has a different purpose, from checking basic mold operation to verifying corrected parts.
The naming isn’t universal. Some manufacturers call their first internal trial T0, while others start with T1. Confirm the supplier’s definitions before reviewing injection molding samples.
|
Stage |
Main Purpose |
Typical Outcome |
|
T0 |
Check mold operation, filling, and ejection |
Initial samples with possible defects |
|
T1 |
Inspect dimensions, appearance, and fit |
Detailed feedback and required corrections |
|
T2 |
Verify corrections and consistency |
Samples evaluated for production approval |
The goal isn’t simply to reach T2. It’s to produce parts that meet the agreed specifications consistently.
What Happens During Each Mold Trial Stage?
Each injection mold trial should answer a specific question: Does the mold work? Do the parts meet requirements? Can the results be repeated?
T0: Initial Mold Function Check

T0 is usually the first internal trial after mold assembly. Engineers focus on whether the mold can operate correctly and produce initial parts.
Typical checks include:
-
Mold opening, closing, and alignment
-
Filling, cooling, and ejection
-
Slider and lifter movement
-
Obvious defects such as flash, short shots, or sticking
Perfect parts aren’t expected yet. The main output is a record of problems that need attention before the next trial.
T1: First Formal Sample Inspection

T1 is where the parts receive a closer look. Engineers compare dimensions, appearance, and performance against the approved requirements.
Key checks include:
-
Appearance: Sink marks, weld lines, flash, and surface defects.
-
Assembly: Snap-fits, screw bosses, mounting holes, and mating components.
-
Function: Mechanical or product-level tests where required.
A T1 submission should ideally include samples, dimensional results, defect photos, and trial conditions. This gives both teams a clear basis for deciding what to change.
T2: Correction Verification and Repeatability

T2 follows the adjustments identified during T1. The question now is whether those changes worked and whether the results are consistent.
Engineers should check corrected dimensions, assembly fit, cosmetic quality, and differences between mold cavities.
For example, a four-cavity mold might produce three acceptable parts while the fourth remains out of tolerance. That issue still needs attention, even if the other samples look fine.
A successful T2 trial is encouraging, but final approval also depends on the required injection molding process window and project acceptance criteria.
Injection Mold Trial Checklist for T0, T1, and T2
A practical checklist keeps trial reviews focused and makes it easier to track outstanding problems.
|
Check Item |
T0 |
T1 |
T2 |
|
Mold operation |
Initial check |
Verify changes |
Confirm stability |
|
Filling and ejection |
Initial check |
Review defects |
Confirm corrections |
|
Critical dimensions |
Basic check |
Full inspection |
Verify results |
|
Surface appearance |
Major defects |
Detailed review |
Confirm quality |
|
Assembly and function |
If applicable |
Full evaluation |
Retest |
|
Process consistency |
Initial observations |
Record conditions |
Check repeatability |
What Should an Injection Mold Trial Report Include?
Proper injection mold sampling needs more than physical parts. Without clear records, it’s hard to tell whether a correction actually helped.
A useful trial report includes:
-
Mold ID, drawing revision, and material grade
-
Machine settings and trial conditions
-
Sample quantity and cavity identification
-
Critical dimensional measurements
-
Defect photos and required corrections
-
Results of previous corrective actions
These records also help engineers compare different trial rounds without relying on memory or visual impressions.
Process Adjustment or Mold Modification?
Not every defect requires changing the mold. Sometimes processing conditions are responsible. Other times, the problem is built into the tooling or part geometry.
|
Problem |
What to Investigate |
|
Short shots |
Injection settings, venting, and gate restrictions |
|
Sink marks |
Packing conditions and local wall thickness |
|
Flash |
Clamping conditions and mold shut-offs |
|
Snap-fit interference |
Shrinkage, dimensions, and feature geometry |
|
Warpage |
Cooling balance, packing, and part design |
|
One cavity out of tolerance |
Cavity dimensions and filling differences |
Take a snap-fit that doesn’t engage properly. Adjusting packing pressure might help, but it could also affect other dimensions. If the snap geometry itself is wrong, a mold correction may be needed.
The better approach is to verify the cause before making changes. At HingTung, tooling and injection molding are handled within the same manufacturing workflow, making it easier to review mold-related and process-related issues together.
What Should Be Approved Before Mass Production?

Passing T2 doesn’t automatically mean production can start. The mold and process must meet the project’s agreed requirements.
Before approval, confirm:
-
Dimensions: Critical measurements meet drawing tolerances.
-
Appearance: Cosmetic defects fall within agreed limits.
-
Assembly: Parts fit and function as intended.
-
Corrections: Important trial issues have been resolved.
-
Consistency: Results are acceptable across relevant cavities and repeated cycles.
-
Documentation: Final drawings, inspection results, and process conditions are recorded.
Sample selection matters, too. Ten attractive T1 parts from one cavity may tell you less than properly identified samples taken from several cavities.
There’s no universal sample count that proves a mold is stable. The right number depends on the part, number of cavities, critical features, and inspection plan.
This is one reason samples can pass while mass production later fails. Sample approval is important, but it isn’t a substitute for production-process verification.
FAQs
How Many T1 Samples Should You Request?
It depends on cavity count, critical dimensions, assembly tests, and project requirements. Ask for enough representative samples to evaluate the intended features, ideally with cavity identification.
Can a Mold Need More Than Three Trial Rounds?
Yes. Complex molds, tight tolerances, or unresolved defects may require T3 or additional trials. The number of rounds matters less than whether the mold meets its acceptance criteria.
Should Customers Attend Injection Mold Trials?
Not always. On-site reviews can help with complex projects, but detailed inspection reports, trial videos, and remote meetings may be sufficient for other applications.
Conclusion
T0 checks mold function, T1 evaluates part quality, and T2 verifies corrections. A clear injection mold trial checklist helps teams identify problems early and avoid approving a mold based on incomplete evidence.